Dolunts
SafetyVision
DashboardLive FeedTest DetectionViolationsWorkersZonesMissionsReportsAnalyticsCAPAsSettings
v0.1.0 · build dlnts-20260516
    MissionsDLN-DTP-003

Mission · DLN-DTP-003

Dolunts D7-Indoor · DTP · 834 flight hours · 825 missions completed

In Mission
Battery
57%
in flight
Altitude
6.2 m
indoor cruise
Detections (mission)
0
No events in window
Last seen
May 16, 08:50 PM

Mission route — Final Assembly · loop

Body ShopFinal AssemblyLoading DockWP-1WP-2WP-3WP-4WP-5WP-6DLN-DTP-003

Telemetry · last 60 minutes

Findings on this mission · 0

No violations detected on this mission.

Drone specs

Model
Dolunts D7-Indoor
Plant
DTP
Status
In Mission
Battery
57%
Flight hours
834
Missions
825
Payloads
RGB · Thermal
Dock
DTP-DOCK-01

Mission log

  • • May 16, 2026 06:00 — Mission queued
  • • May 16, 2026 06:02 — Pre-flight check passed
  • • May 16, 2026 06:03 — Takeoff from DTP-DOCK-01
  • • May 16, 2026 06:18 — WP-3 reached
  • • Now — Loitering at WP-4, scanning Final Assembly
Demonstration build · Synthetic data · Production deployments connect to ServiceNow, Manhattan WMS, Genetec VMS, and Lenel via standard APIs. Request a live integration walkthrough.build dlnts-20260516support@dolunts.com